TNB Meter Installation Cost | Charges & Deposit

Wondering how much TNB meter installation costs?

The total cost depends on the type of electricity supply, property category, TNB connection charges, security deposit and electrical work required before the meter can be installed.

In general, the overall amount may include payments to TNB as well as electrical contractor costs.

For application and installation services, refer to our TNB meter application service.

📲 WhatsApp us for an initial assessment of your TNB meter requirements.

TNB meter installation costs depend on the type of electricity supply

How Much Does TNB Meter Installation Cost?

There is no single fixed price for every TNB meter application. The total amount varies according to the electricity supply, property category and electrical work required.

The main cost components may include:

  • TNB connection charge
  • Electricity security deposit
  • Stamp duty or related charges where applicable
  • Electrical contractor costs
  • Meter board and related wiring preparation
  • Additional work required at the site

The applicable charges need to be completed before the TNB meter installation

TNB Meter Connection Charges

The connection charge depends on the type of application and electricity connection required.

Based on the reference rates:

  • New domestic single-phase overhead supply: RM450
  • New domestic three-phase overhead supply: RM750
  • New domestic three-phase underground supply: RM1,700

For commercial applications or other types of connections, the applicable charge may vary according to the connection category and requirements.

The final amount should be based on the current applicable rate and invoice issued for the application.

Single-Phase TNB Meter Deposit

The security deposit for a domestic single-phase supply varies according to the type and category of property.

Based on the reference deposit rates, the amount ranges from approximately:

  • RM170 for certain property categories such as kampung houses, flats and selected residential properties
  • RM250 for certain residential categories
  • RM500 for selected terrace houses, apartments, townhouses and related property categories
  • RM700 for larger homes or selected categories
  • RM900 for bungalows above one storey

The actual deposit depends on the property category used for the application.

Three-Phase TNB Meter Deposit

The security deposit for a domestic three-phase supply also varies according to the property category.

Reference deposit amounts include:

  • RM400 for certain residential categories
  • RM700 for selected houses and apartments
  • RM1,200 for larger residential properties or selected categories
  • RM1,600 for bungalows above one storey

A three-phase supply generally involves a higher security deposit than a single-phase supply because the electricity supply requirements and estimated consumption may be higher.

Commercial TNB Meter Deposit

For new commercial TNB meter applications, the reference deposit rates are:

  • Single-phase TNB meter: RM480
  • Three-phase TNB meter: RM2,760

Deposit requirements for reconnection or other commercial applications may differ from those for a new application.

Is a Single-Phase or Three-Phase Meter More Expensive?

In general, a three-phase electricity supply may involve higher deposits and connection-related costs than a single-phase supply.

However, the choice between single-phase and three-phase should be based on the actual electrical load and requirements of the property rather than cost alone.

For a detailed comparison, refer to our single-phase vs three-phase guide.

Electrical Contractor Costs

In addition to TNB charges and deposits, electrical contractor costs may apply where electrical preparation or installation work is required.

This may include:

  • Meter board preparation
  • Wiring related to the meter installation
  • Electrical system assessment
  • Relevant documentation or submission
  • Testing before the electricity supply is connected

The actual contractor cost depends on the site condition, type of electricity supply and scope of work required.

What Affects TNB Meter Installation Cost?

  • Single-phase or three-phase supply
  • Domestic or commercial property
  • Overhead or underground connection
  • Required electricity capacity
  • Existing wiring and meter board condition
  • Property deposit category
  • Additional electrical work required on site

This is why the total cost should be determined after the type of application and property requirements are identified.

📲 Need a cost estimate for your property? WhatsApp us for an initial assessment.

Is the TNB Meter Cost the Same for Every Property?

No. The property type and category can affect the security deposit, while the type of electricity supply and connection can affect other charges.

As a result, two different properties may have different total application and installation costs.

Does TNB Meter Installation Cost Include Wiring?

Not necessarily. TNB charges and electrical contractor costs are separate components.

If the property requires a meter board, new wiring or other electrical preparation, the additional cost will depend on the actual work required.

Do I Need an Electrical Contractor for a TNB Meter Application?

Some applications involve electrical work and technical requirements that need to be handled by a registered electrical contractor.

  • Registered with Suruhanjaya Tenaga (ST)
  • Registered with CIDB Malaysia
  • Electrical preparation related to the meter installation
  • Assessment based on actual site requirements

For information about the required documents, payments and application steps, read our guide to applying for TNB electricity supply.

FAQ

How much is the TNB connection charge for a single-phase meter?

For a new domestic single-phase overhead supply, the reference connection charge is RM450.

How much is the deposit for a single-phase TNB meter?

The domestic single-phase deposit ranges from approximately RM170 to RM900 depending on the property category.

How much is the deposit for a three-phase TNB meter?

The domestic three-phase deposit ranges from approximately RM400 to RM1,600 depending on the property category. The reference deposit for a new commercial three-phase application is RM2,760.

Are these TNB meter charges fixed?

Not necessarily. Charges, deposits and application requirements may change or vary according to the application. The final amount should be based on the current applicable rates and invoice for the application.

Need a TNB Meter Installation Cost Estimate?

The total cost depends on the electricity supply, property category, TNB charges and electrical work required.

📲 WhatsApp us for an initial assessment and TNB meter installation cost estimate.

WhatsApp Us Now

 